How do I get a Building Permit?
The first step is applying for a permit. The application will include a City permit application form, plans showing the proposed improvements, and a written description of the scope of the work. Additional information is available on the Forms and Handouts page at http://www.cityofrsm.org/197/Forms-Handouts. When the permit is issued, work can begin. The Building Division provides a job card that must remain on the project site for the duration of construction. The job card will be used to record all necessary inspections. It is the responsibility of the homeowner or contractor to schedule building inspections for specific times during construction.http://www.cityofrsm.org/197/Forms-Handouts

Show All Answers

1. When is a Building Permit required?
2. Why is a Building Permit required?
3. Are any projects exempt from a Building Permit?
4. How do I get a Building Permit?
5. How much does a Building Permit cost?
6. Where do I get a Building Permit?
7. What is a Building Inspection?
8. How do I schedule a Building Inspection?
9. How do I know if my contractor is licensed?
10. How long is the plan check process?
11. What is my plan check status?
12. When does a Building Permit expire?
13. Where is the Building Department located and what are the hours?
14. Why do I need a permit to replace a water heater?
15. Can I use an existing slab when I'm building my new patio cover?
16. Do I need Energy Efficient lighting in my kitchen remodel?
17. Can we build a storage shed in our backyard?
18. Are Building Permits required for a retaining wall?
19. Does the City have sample plans to help me design my project?
20. What are the benefits to obtaining a Building Permit?
21. Why would a contractor tell me I don’t need a Building Permit when one is actually required?